Bitte benutzen Sie diese Kennung, um auf die Ressource zu verweisen: http://dx.doi.org/10.18419/opus-4225
Langanzeige der Metadaten
DC ElementWertSprache
dc.contributor.authorHeisel, Uwede
dc.contributor.authorHammer, Helmutde
dc.date.accessioned2009-12-23de
dc.date.accessioned2016-03-31T08:16:03Z-
dc.date.available2009-12-23de
dc.date.available2016-03-31T08:16:03Z-
dc.date.issued1992de
dc.identifier.other318616343de
dc.identifier.urihttp://nbn-resolving.de/urn:nbn:de:bsz:93-opus-48755de
dc.identifier.urihttp://elib.uni-stuttgart.de/handle/11682/4242-
dc.identifier.urihttp://dx.doi.org/10.18419/opus-4225-
dc.description.abstractA major prerequisite for the economical operation of Flexible Manufacturing Systems is a high level a availability. This is determined, on the one hand, by technical factors and, on the other hand, by limitatIons in the corporate organization and personnel. The paper presents results of a field study, in which reasons for breakdowns caused by technical errors and inadequate organization are viewed in relation to the effects of insufficient qualification and motivation of personnel.en
dc.language.isoende
dc.rightsinfo:eu-repo/semantics/openAccessde
dc.subject.classificationFlexible Fertigung , Effizienzanalysede
dc.subject.ddc670de
dc.titleInfluences on the availability of flexible manufacturing systemsen
dc.typearticlede
dc.date.updated2010-10-07de
ubs.fakultaetFakultät Konstruktions-, Produktions- und Fahrzeugtechnikde
ubs.institutInstitut für Werkzeugmaschinende
ubs.opusid4875de
ubs.publikation.sourceCIRP Annals 41 (1992), S. 459-462de
ubs.publikation.typZeitschriftenartikelde
Enthalten in den Sammlungen:07 Fakultät Konstruktions-, Produktions- und Fahrzeugtechnik

Dateien zu dieser Ressource:
Datei Beschreibung GrößeFormat 
hei87.pdf292,99 kBAdobe PDFÖffnen/Anzeigen


Alle Ressourcen in diesem Repositorium sind urheberrechtlich geschützt.