Bitte benutzen Sie diese Kennung, um auf die Ressource zu verweisen:
http://dx.doi.org/10.18419/opus-8948
Autor(en): | Mafra, Priscilla Kalinowski, Marcos Méndez Ferández, Daniel Felderer, Michael Wagner, Stefan |
Titel: | Towards guidelines for preventing critical requirements engineering problems |
Erscheinungsdatum: | 2016 |
Dokumentart: | Konferenzbeitrag |
Konferenz: | Euromicro Conference on Software Engineering and Advanced Applications (42nd, 2016, Limassol) |
Erschienen in: | Proceedings / 42nd Euromicro Conference on Software Engineering and Advanced Applications, SEAA 2016, 31 August - 2 September 2016, Limassol, Cyprus. Los Alamitos, Calif. : IEEE Computer Society Conference Publishing Services, 2016. - ISBN 978-1-5090-2819-1, S. 25-29 |
URI: | http://nbn-resolving.de/urn:nbn:de:bsz:93-opus-ds-89654 http://elib.uni-stuttgart.de/handle/11682/8965 http://dx.doi.org/10.18419/opus-8948 |
ISBN: | 978-1-5090-2819-1 978-1-5090-2820-7 978-1-5090-2821-4 |
ISSN: | 2376-9505 |
Bemerkungen: | (c) 2016 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other users, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works for resale or redistribution to servers or lists, or reuse of any copyrighted components of this work in other works. |
Zusammenfassung: | [Context] Problems in Requirements Engineering (RE) can lead to serious consequences during the software development lifecycle. [Goal] The goal of this paper is to propose empirically-based guidelines that can be used by different types of organisations according to their size (small, medium or large) and process model (agile or plan-driven) to help them in preventing such problems. [Method] We analysed data from a survey on RE problems answered by 228 organisations in 10 different countries. [Results] We identified the most critical RE problems, their causes and mitigation actions, organizing this information by clusters of size and process model. Finally, we analysed the causes and mitigation actions of the critical problems of each cluster to get further insights into how to prevent them. [Conclusions] Based on our results, we suggest preliminary guidelines for preventing critical RE problems in response to context characteristics of the companies. |
Enthalten in den Sammlungen: | 05 Fakultät Informatik, Elektrotechnik und Informationstechnik |
Dateien zu dieser Ressource:
Datei | Beschreibung | Größe | Format | |
---|---|---|---|---|
1611.08833v1.pdf | 247,97 kB | Adobe PDF | Öffnen/Anzeigen |
Alle Ressourcen in diesem Repositorium sind urheberrechtlich geschützt.