Dynamic monitoring of Frequency Containment Reserve activation

dc.contributor.authorMaucher, Philipp
dc.contributor.authorLens, Hendrik
dc.date.accessioned2022-03-18T08:45:33Z
dc.date.available2022-03-18T08:45:33Z
dc.date.issued2021de
dc.description.abstractFrequency Containment Reserve (FCR), also known as primary control reserve, is the fastest active power reserve (APR) used for system balancing. In the past, FCR was provided by a limited number of large units and the technical requirements on FCR activation could be monitored by a manual procedure. Due to the fact that FCR increasingly is provided by a large number of smaller units, manual procedures are no viable option for the future. For this reason, this article describes an automated concept for monitoring the quality of the activation of FCR during operation. Before FCR monitoring can be carried out, however, the measured active power has to be apportioned among the scheduled power and the different APR products, as they may be provided simultaneously. This article presents a method for the separation of different APR products based on dynamic models. In the proposed monitoring concept, a tolerance channel is created based on the FCR setpoint, defining the admissible range for FCR activation. This tolerance channel is established by means of a dynamic model corresponding to the slowest reserve provider (RP) whose FCR activation is still considered to be compliant. For the purpose of evaluation for longer time periods, the actual FCR activation is normalized relative to the tolerance channel. Finally, the article discusses results obtained with the proposed monitoring concept for different kinds of non-compliant FCR activation such as limited or delayed activation.en
dc.identifier.issn1435-3199
dc.identifier.other1800066651
dc.identifier.urihttp://nbn-resolving.de/urn:nbn:de:bsz:93-opus-ds-120546de
dc.identifier.urihttp://elib.uni-stuttgart.de/handle/11682/12054
dc.identifier.urihttp://dx.doi.org/10.18419/opus-12037
dc.language.isoende
dc.rightsinfo:eu-repo/semantics/openAccessde
dc.subject.ddc620de
dc.titleDynamic monitoring of Frequency Containment Reserve activationen
dc.typearticlede
ubs.fakultaetEnergie-, Verfahrens- und Biotechnikde
ubs.institutInstitut für Feuerungs- und Kraftwerkstechnikde
ubs.publikation.seiten45-52de
ubs.publikation.sourceVGB PowerTech 11 (2021), S. 45-52de
ubs.publikation.typZeitschriftenartikelde

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
Maucher_Lens-FCR_monitoring.pdf
Size:
2.78 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
3.3 KB
Format:
Item-specific license agreed upon to submission
Description: