Design recommendations for concrete pryout capacity of headed steel studs and post-installed anchors
dc.contributor.author | Jebara, Khalil | |
dc.contributor.author | Sharma, Akanshu | |
dc.contributor.author | Ožbolt, Joško | |
dc.date.accessioned | 2023-10-23T13:04:33Z | |
dc.date.available | 2023-10-23T13:04:33Z | |
dc.date.issued | 2023 | de |
dc.date.updated | 2023-08-08T14:01:50Z | |
dc.description.abstract | Current formulas to assess the shear capacity of headed steel stud anchors and post-installed (PI) anchors in case of pryout failure (sometimes known as pull-rear failure) have been derived either based on the indirect-tension resistance model or are fully empirical based on push-out test results. In both cases, the predicted pryout capacity is clearly conservative and underestimates the true pryout capacity of anchorages, especially for stiff anchors with low embedment-to-diameter ratios (hef/d < 4.5). This paper proposes an empirical and a semi-empirical formula to predict the concrete pryout capacity of headed steel studs and PI anchors. They were derived based on an improved indirect-tension model which accounts for the stud diameter and the stud spacing in a group of anchors. Furthermore, a database of 214 monotonic shear tests from the literature, including own tests (push-off and horizontally shear tests), is reevaluated and compared to the provisions of EN1992-4. The scope of this assessment proposal includes single and group of headed steel studs and PI anchors attached to a stiff steel plate as well as shear connectors in composite structures without metal deck embedded in normal-weight concrete. | en |
dc.identifier.issn | 2673-4109 | |
dc.identifier.other | 1870376447 | |
dc.identifier.uri | http://nbn-resolving.de/urn:nbn:de:bsz:93-opus-ds-136836 | de |
dc.identifier.uri | http://elib.uni-stuttgart.de/handle/11682/13683 | |
dc.identifier.uri | http://dx.doi.org/10.18419/opus-13664 | |
dc.language.iso | en | de |
dc.relation.uri | doi:10.3390/civileng4030044 | de |
dc.rights | info:eu-repo/semantics/openAccess | de |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | de |
dc.subject.ddc | 624 | de |
dc.title | Design recommendations for concrete pryout capacity of headed steel studs and post-installed anchors | en |
dc.type | article | de |
ubs.fakultaet | Bau- und Umweltingenieurwissenschaften | de |
ubs.fakultaet | Fakultätsübergreifend / Sonstige Einrichtung | de |
ubs.institut | Institut für Werkstoffe im Bauwesen | de |
ubs.institut | Fakultätsübergreifend / Sonstige Einrichtung | de |
ubs.publikation.seiten | 782-807 | de |
ubs.publikation.source | CivilEng 4 (2023), S. 782-807 | de |
ubs.publikation.typ | Zeitschriftenartikel | de |